Product Detail :
|
Implementation of a smart water supply system including operation and maintenance for 5 years impacting the network under corporation of the city of panaji. replacement centrifugal pumpsets in mld plant with 2 stage new design pumps to fit on the present foundation along with 550kw squirrel cage induction motors. replacement 3.3 kv motor control panel, transformer etc for pump houses at opa water works. retrofitting of 2 nos of kirloskar make bhr42-36 degree,4 stage vertical turbine pumps, for 40 mld raw water pump house along with 875 kw squirrel cage induction motors. supply, installation, testing and commissioning of horizontal split casing pumps for 27 mld plant to obtain 162 lps discharge to fit on the present foundation along with 480 kw squirrel cage induction motors. providing and fixing smart water meters for advanced and automated meter readings including operation and maintenance of the system for 5 years for panaji city.
|